Registration documents are prepared by proponents and made available in the language in which they were received by the Department of Environment and Local Government.
Project number: 1399
Date registered: 2015/01/07
Proponent: Irishview Estates Ltd. (PDF 4.2 MB)
Description: The project involves the construction of the Irishview Estates Subdivision in 10 phases. The proponent is proposing to develop up to 185 residential lots on 113 hectares of land located off Route 115, approximately 2.2 km north of the Moncton city limits.
Location: Westmorland
EIA specialist: Crystale Harty
Status: Certificate of Determination Issued (PDF 37 KB)
Date of decision: 2015/09/25
Project number: 1400
Date registered: 2015/01/12
Proponent: Havelock Wastewater Collection and Treatment System (PDF 4 MB)
Description: The proposed project will involve the construction of a new wastewater collection and treatment system. The sewer main will have 145 connections which will extend approximately 6.7 km.
Location: Kings
EIA specialist: Shawn Hamilton
Status: Certificate of Determination Issued (PDF 177 KB)
Date of decision: 2016/03/15
Project number: 1401
Date registered: 2015/01/26
Proponent: McAllister Industrial Park Fertilizer Production Facility (PDF 27 MB)
Description: The Atlantic Potash Corporation is proposing to construct and operate a potassium nitrate (KNO3) fertilizer production facility in McAllister Industrial Park in Saint John, NB. In total, the facility would have the capacity to produce 180,000 metric tonnes per annum of KNO3 fertilizer.
Location: Saint John
EIA specialist: Shawn Hamilton
Status: Determination review in progress
Project number: 1402
Date registered: 2015/01/30
Proponent: City of Saint John (PDF 2.1 MB)
Description: The proposed project involves the decommissioning of the Marsh Creek Wastewater Treatment Plant on Thorne Avenue that is no longer used. The decommissioning includes removal of buildings, lagoon walls, foundations and backfilling.
Location: Saint John
EIA specialist: Lee Swanson
Status: Certificate of Determination Issued (PDF 26 KB)
Date of decision: 2017/05/17
Project number: 1403
Date registered: 2015/02/18
Proponent: Trevali Mining Corporation (PDF 4.8 MB)
Description: The project includes adding a copper separation circuit within the existing concentrator, expanding the existing storage shed by adding a copper storage/loading building, and adding a transformer station at the Caribou mine site.
Location: Restigouche
EIA specialist: Sheila Goucher
Status: Certificate of Determination Issued (PDF 156 KB)
Date of decision: 2015/05/28
Project number: 1404
Date registered: 2015/03/03
Proponent: Department of Education and Early Childhood Development (PDF 9.4 MB)
Description: The project consists of decommissioning an existing wastewater treatment lagoon serving the Geary Elementary School, and replacing it with an engineered wetland, followed by sand filter infiltration, in Geary, NB.
Location: Sunbury
EIA specialist: Crystale Harty
Status: Certificate of Determination Issued (PDF 164 KB)
Date of decision: 2015/06/19
Project number: 1405
Date registered: 2015/03/18
Proponent: Glencore Canada Corporation (PDF 617 KB)
Description: The project consists of a water supply source assessment to develop a new water supply for operations at the Brunswick #12 site.
Location: Gloucester
EIA specialist: Sheila Goucher
Status: Certificate of Determination Issued (PDF 162 KB)
Date of decision: 2015/11/10
Project number: 1406
Date registered: 2015/03/23
Proponent: Potash Corp NB Division (PDF 3.9 MB)
Description: PotashCorp proposes to undertake an expansion of their existing Marine Terminal in Saint John, NB, to accommodate increased potash and salt production related to the Picadilly Expansion Project.
Location: Saint John
EIA specialist: Shawn Hamilton
Status: Determination review in progress
Project number: 1407
Date registered: 2015/04/07
Proponent: Village of Charlo (PDF 1.3 MB)
Description: Groundwater Exploration Program – The proponent is proposing to replace an existing back-up water well (located along the Charlo Dam Road) by developing a new well approximately 80 m to the east of the existing one.
Location: Restigouche
EIA specialist: Pierre Doucet
Status: Certificate of Determination Issued (PDF 161 KB)
Date of decision: 2016/01/20
Project number: 1408
Date registered: 2015/04/20
Proponent: McLaughlin Hydrocarbon Contaminated Water and Soil Treatment and Disposal (PDF 423 KB)
Description: The proposed project consists of accepting and subsequently treating hydrocarbon contaminated soil at the McLaughlin Soil Management facility in the Local Service District of Grand Falls. The hydrocarbon contaminated soil would be potentially sourced from New Brunswick, Quebec, Nova Scotia, or Maine.
Location: Victoria
EIA specialist: Shawn Hamilton
Status: Certificate of Determination Issued (PDF 137 KB)
Date of decision: 2017/12/04
Project number: 1409
Date registered: 2015/05/19
Proponent: McCain Foods (Canada) Ltd. (PDF 3.9 MB)
Description: Water Supply Source Assessment to test new back-up supply wells for potable water well at the McCain Foods Grand Falls facility.
Location: Madawaska
EIA specialist: Lee Swanson
Status: Certificate of Determination Issued (PDF 27 KB)
Date of decision: 2016/04/29
Project number: 1410
Date registered: 2015/05/28
Proponent: Cooke Aquaculture
Appendices:
- Appendix A: Correspondence from Rural Planning Zoning Commission (PDF 10.1 MB)
- Appendix B: Project C15.23 OBH Genomics Unit (Sorensen Eng., 2017) (PDF 6 MB)
- Appendix C: EIA Registration Document Oak Bay Salmon Hatchery (Strum Consulting, 2015) (PDF 3.2 MB)
- Appendix D: Benthic Invertebrae and Fish Study Date (Strum Consulting, 2015) (PDF 1.3 MB)
- Appendix E: Fish and Benthic Summary Report from Strum Data (Sorensen Engineering Ltd, 2016) (PDF 1.9 MB)
- Appendix F: Water Quality Environmental Baseline Study Report (Strum Consulting, 2015) (PDF 4 MB)
- Appendix G: Mixing Zone Study Proposal (Sweeney International Management Corp. 2017) (PDF 860 KB)
- Appendix H: Predictive Modelling (Archaeological Services New Brunswick, 2017) (PDF 6.6 MB)
- Appendix I: Oak Bay Hatchery Approval to Operate I-9921 (NBDELG, 2017) (PDF 569 KB)
- Appendix J: Waste Management Plan - Oak Bay Hatchery (Kelly Cove Salmon Ltd., 2016) (PDF 900 KB)
- Appendix K: Integrated Contingency Plan (Kelly Cove Salmon Ltd., 2016) (PDF 799 KB)
- Appendix L: Sorensen Engineering Response to TRC (Sorensen Eng., October 2017) (PDF 12.8 MB)
- Appendix M: Maxxam Labs Documentation (2017) (PDF 989 Ko)
Description: The project proposes to upgrade the existing wastewater treatment plant at the Oak Bay Hatchery including replacing buildings and the drum filter installation. The project was expanded in December 2017 to include a Water Supply Source Assessment (WSSA) and a new Genomics Unit.
Location: Charlotte
EIA specialist: Lee Swanson
Status: Certificate of Determination Issued (PDF 179 KB)
Date of decision: 2018/06/29
Project number: 1411
Date registered: 2015/06/08
Proponent: New Brunswick Department of Transportation and Infrastructure (PDF 13.8 MB)
Description: Stella-Maris-de-Kent Hospital WWTP Upgrade – The proponent is proposing to upgrade its wastewater treatment plant by, among other things, constructing two new aerated cells, decommissioning the existing facultative lagoon, and installing a new outfall pipe.
Location: Kent
EIA specialist: Pierre Doucet
Status: Certificate of Determination Issued (PDF 157 KB)
Date of decision: 2015/09/10
Project number: 1412
Date registered: 2015/06/08
Proponent: North Shore MicMac District Council
- Little Southwest Miramichi River Restoration Project - The Oxbow EIA (PDF 5.7 MB)
- Conceptual Design Overview (PDF 1.2 MB)
- Hydraulic Assessment of the Little Southwest Miramichi River at Johnston’s Pit at the Oxbow (PDF 6.5 MB)
- Little Southwest Miramichi River Bank Restoration Design (cover) (PDF 394 KB)
- Little Southwest Miramichi River Bank Restoration Design Plan View (PDF 579 KB)
- Little Southwest Miramichi River Bank Restoration Design XS 1-3 (PDF 199 KB)
- Little Southwest Miramichi River Bank Restoration Design XS 4-6 (PDF 200 KB)
- Little Southwest Miramichi River Bank Restoration Design Construction Details (PDF 1 MB)
- Little Southwest Miramichi River Bank Restoration Design ESC (PDF 747 KB)
Description: Implementation of a Restoration Design to minimize erosion occurring on the Little Southwest Miramichi River opposite from The Oxbow, Red Bank.
Location: Northumberland
EIA specialist: Lee Swanson
Status: Certificate of Determination Issued (PDF 27 KB)
Date of decision: 2016/06/01
Project number: 1413
Date registered: 2015/06/24
Proponent: OSAFE : Organic and Sustainable Atlantic Food and Energy Ltd. (PDF 5.7 MB)
Description: The development of a 25 acre farm for the production of Pekin ducks, an aquaculture operation for the production of Tilapia fish and a greenhouse for growing organic vegetables year round; to be located on the East side of Grand Lake, NB.
Location: Queens
EIA specialist: Zane Jefferies
Status: Certificate of Determination Issued (PDF 167 KB)
Date of decision: 2015/11/13
Project number: 1414
Date registered: 2015/07/07
Proponent: Esgenoôpetitj First Nation
Appendices:
- Appendix A - Property Ownership Plans: Existing and Proposed Esgenoôpetitj First Nation Wastewater Treatment Facilities (PDF 1.2 MB)
- Appendix B - Drawings to Accompany the ERA Registration Document for the Upgrading of the Wastewater Collection and Treatment System (PDF 26 KB)
- Appendix C - GeoNB Aerial Photographic Plans Showing Adjacent Development, Esgenoôpetitj First Nation Proposed WWTF Site (PDF 3 MB)
- Appendix D - Receiving Water Characterization Study for a Future Outfall Of the Burnt Church Wastewater Treatment Plant”, NATECH (PDF 7.8 Mo)
- Appendix E - Geotechnical Information, Proposed Esgenoôpetitj First Nation Proposed WWTF Site”, Conquest Engineering Ltd. / Supplementary Geotechnical Investigation, New WWTF, Esgenoôpetitj First Nation, Burnt Church, NB”, Conquest Engineering Ltd. / Geotechnical Investigation for a New Treated Wastewater Outfall, Esgenoôpetitj First Nation, Burnt Church, NB”, Conquest Engineering Ltd. (to follow) (PDF 2.8 MB)
- Appendix F - Proposed Environmental Management Plan / Proposed Sewage Management Plan (PDF 110 KB)
Description: The project involves the construction and operation of a new aerated lagoon to replace the existing system at the Esgenoôpetitj First Nation. The new system will be composed of four aerated cells and include UV disinfection. The effluent pipe will extend into the Inner Miramichi Bay. The project will also include upgrades and new sections to the wastewater collection system and decommissioning of the existing wastewater treatment system.
Location: Northumberland
EIA specialist: Sheila Goucher
Status: Certificate of Determination Issued (PDF 29 KB)
Date of decision: 2016/07/13
Project number: 1415
Date registered: 2015/07/31
Proponent: Miscou Fish Product Inc. (PDF 4.5 MB)
Description: Back-up Well for Fish Processing Plant – The proponent is proposing to drill and develop a new back-up well for its existing fish processing plant in Miscou.
Location: Gloucester
EIA specialist: Pierre Doucet
Status: Certificate of Determination Issued (PDF 27 KB)
Date of decision: 2016/04/04
Project number: 1416
Date registered: 2015/08/19
Proponent: Fisheries and Oceans Canada (PDF 1.2 MB)
Description: The proposed project includes new infrastructure and dredging to take place at the Small Craft Harbour in Back Bay, NB. The project includes construction of a marginal wharf, service area, shore protection and dredging.
Location: Charlotte
EIA specialist: Shawn Hamilton
Status: Determination review in progress
Date of decision: 2015/08/19
Project number: 1417
Date registered: 2015/08/19
Proponent: Fisheries and Oceans Canada (PDF 1.1 MB)
Description: Alma Dredging and Wharf Repairs/Expansion – The proponent is proposing to dredge near the existing Alma wharf and also undertake repairs and an expansion of the wharf.
Location: Albert
EIA specialist: Pierre Doucet
Status: Certificate of Determination Issued (PDF 161 KB)
Date of decision: 2016/02/04
Project number: 1418
Date registered: 2015/08/26
Proponent: The Department of Fisheries and Oceans – Small Craft Harbours (DFO-SCH) (PDF 1.4 MB)
Description: The proposed harbor improvement project consists of the construction of a breakwater, modifications to the old ferry wharf, construction of a service area, installation of floating docks and gangway system, and dredging of the east basin in North Head, NB.
Location: Charlotte
EIA specialist: Crystale Harty
Status: Certificate of Determination Issued (PDF 164 KB)
Date of decision: 2015/12/11
Project number: 1419
Date registered: 2015/08/27
Proponent: The Department of Fisheries and Oceans – Small Craft Harbours (DFO-SCH) (PDF 818 KB)
Description: The proposed harbour improvement project consists of the construction of a breakwater and service area and dredging of the harbour channel in Leonardville, Fundy NB.
Location: Charlotte
EIA specialist: Sheila Goucher
Status: withdrawn by proponent
Date of decision: 2015/09/08
Project number: 1420
Date registered: 2015/09/08
Proponent: City of Miramichi (PDF 45 KB)
Description: Chatham Area Groundwater Exploration – The proponent is proposing to conduct groundwater exploration in the Chatham area in the hopes of developing a new municipal groundwater well.
Location: Northumberland
EIA specialist: Pierre Doucet
Status: Certificate of Determination Issued (PDF 175 KB)
Date of decision: 2019/02/19
Project number: 1421
Date registered: 2015/09/24
Proponent: Kenny’s Development Ltd. (PDF 14.2 MB)
Description: The project, River Mist Estates, consists of the development of 44 condominium units in Maugerville, NB with communal water supplies and a communal wastewater disposal system.
Location: Sunbury
EIA specialist: Lee Swanson
Status: Approval Denied
Date of decision: 2015/09/29
Project number: 1422
Date registered: 2015/09/29
Proponent: Town of Woodstock
Appendices:
- Appendix A - Project Related Documents (18.9 MB)
- Appendix B - Project Site - Photos (PDF 580 KB)
- Appendix C - Atlantic Canada Conservation Data Centre - Site-specific Report (PDF 1.5 MB)
- Appendix D - Public Involvement Documents (to be provided separate) (PDF 747 KB)
Description: Groundwater Exploration – The proponent is proposing to conduct groundwater exploration in the Woodstock area in the hopes of developing a new municipal groundwater well.
Location: Carleton
EIA specialist: Rachelle Voisine
Status: Certificate of Determination Issued (PDF 177 KB)
Date of decision: 2018/04/05
Project number: 1423
Date registered: 2015/10/01
Proponent: Prince Edward Island Energy Corporation (PDF 3.3 MB)
Description: The proposed project consists of the installation of two 180 MW submarine cables between Borden, PEI and Cape Tormentine, NB along with approximately 60 km of new transmission line construction between Cape Tormentine and Memramcook.
Location: Westmorland
EIA specialist: Justin Chase
Status: Certificate of Determination Issued (PDF 172 KB)
Date of decision: 2016/04/15
Project number: 1424
Date registered: 2015/10/23
Proponent: Capreit Apartments Inc. (PDF 6.7 MB)
Description: Parkside Estates Production Well Replacement – The proponent is proposing to replace a collapsed well that provided drinking water to the 87-lot subdivision located in Lincoln.
Location: Sunbury
EIA specialist: Pierre Doucet
Status: Certificate of Determination Issued (PDF 160 KB)
Date of decision: 2015/12/22