Record of EIA registrations and determinations 1489 - 1514

Environmental Impact Assessment registrations for processes 1489 - 1514, submitted in 2018 and covering a diverse range of projects in New Brunswick.

Registration documents are prepared by proponents and made available in the language in which they were received by the Department of Environment and Local Government.

Project number: 1489 
Date registered: 2018/01/12 
Proponent: New Brunswick Power Corporation (NB Power) 

Appendices: 

Description: The proposed project consists of the construction and operation of a new substation and new transmission line (Phase 1), and the decommissioning of an existing substation and two existing transmission lines (Phase 2) near Neguac, NB. 
Location: Northumberland & Gloucester 
EIA specialist: Justin Chase 
Status: Certificate of Determination issued (PDF 165 KB)
Date of decision: 2018/07/23 

Project number: 1490 
Date registered: 2018/01/22 
Proponent: NB Power Corporation 

Description: The proponent proposes to install and operate two new submarine electrical transmission cables to Fundy Isles (Deer Island, Campobello Island and Grand Manan) from mainland New Brunswick. 
Location: Charlotte 
EIA specialist: Sheila Goucher 
Status: Certificate of Determination issued (PDF 175 KB)
Date of decision: 2018/09/20 Shape

Project number: 1491 
Date registered: 2018/02/23 
Proponent: Village de Le Goulet (PDF 4.3 MB)
Description: The project consists of the restoration of sand on the Village of Le Goulet’s dune system as a climate change adaptation measure. 
Location: Gloucester 
EIA specialist: Pierre Doucet 
Status: Certificate of Determination issued (PDF 165 KB)
Date of decision: 2018/03/16 

Project number: 1492 
Date registered: 2018/02/28 
Proponent: Pecheries Ste-Cecile Inc. (PDF 11.5 MB)
Description: The proponent is proposing to expand the existing M&N Seafood Plant in Sainte-Cécile (which will continue to process herring roe) with the addition of a separate building that will house a lobster and crab processing line. 
Location: Gloucester 
EIA specialist: Pierre Doucet 
Status: Certificate of Determination issued (PDF 169 KB)
Date of decision: 2018/10/09 

Project number: 1493 
Date registered: 2018/04/16 
Proponent: DFO-SCH (PDF 7.2 MB)
Description: The project consists of the dredging of Shippagan Gully and the construction of a 200 meter long breakwater. 
Location: Gloucester 
EIA specialist: Duane Mercer 
Status: Certificate of Determination issued (PDF 160 KB)
Date of decision: 2019/09/06 

Project number: 1494 
Date registered: 2018/04/16 
Proponent: Wisokolamson Energy LP 

Appendices: 

Description: The proposed project involves the construction of five wind turbine generators with a capacity of 18 Mega Watts and a new substation. The proposed project is located on crown land and private lands south of New Ireland Road. 
Location: Albert 
EIA specialist: Pierre Doucet 
Status: Certificate of Determination issued (PDF 176 KB)
Date of decision: 2018/09/21 Shape

Project number: 1495 
Date registered: 2018/06/25 
Proponent: Sagewill Enterprises Ltd. 

Description: The proposed project involves the development of a limestone quarry north of Hammond River near the community of French Village. 
Location: Kings 
EIA specialist: Pierre Doucet 
Status: Awaiting additional information 

Project number: 1496 
Date registered: 2018/06/27 
Proponent: The Village of Fredericton Junction (PDF 4.4 MB)

Description: The Village is proposing to undertake a ground water exploration program to find an alternate source of drinking water. 
Location: Sunbury 
EIA specialist: Sheila Goucher 
Status: Certificate of Determination issued (PDF 138 KB)
Date of decision: 2020/09/30 

Project number: 1497 
Date registered: 2018/07/10 
Proponent: The Department of Transportation and Infrastructure 

Description: The proponent proposes to remove the Northwest Miramichi River No. 1 (Anderson) Bridge along Route 8 and fully replace it with a new bridge slightly upstream. 
Location: Northumberland 
EIA specialist: Pierre Doucet 
Status: Certificate of Determination issued (PDF 134 KB)
Date of decision: 2020/05/06 

Project number: 1498 
Date registered: 2018/09/18 
Proponent: Trevali Mining (New Brunswick) Ltd. (PDF 4.1 MB)

Description: Trevali is proposing to construct a new tailings management facility (TMF) at the Caribou mine in 2 stages. 

  • Stage 1: Would provide additional tailings storage capacity for the current life of mine. This includes a new tailings dam, emergency spillway, TMF basin, polishing pond and dam, and a water treatment facility. 
  • Stage 2: Would consist of raising the Stage 1 dam which would inundate portions of the mine in support of mine closure and potentially provide additional storage capacity. This stage would involve a dam raise, expanded emergency spillway and tailings basin, and construction of an alternative access road. 

Location: Restigouche 
EIA specialist: Sheila Goucher 
Status: Inactive 

Project number: 1499 
Date registered: 2018/08/10 
Proponent: The Department of Fisheries and Oceans – Small Craft Harbours (DFO-SCH) (PDF 4.1 MB)
Description: The proposed project consists of the construction of a new containment cell for the New Mills Harbour. 
Location: Restigouche 
EIA specialist: Cassandra Colwell 
Status: Certificate of Determination issued (PDF 166 KB)
Date of decision: 2018/12/21 

Project number: 1500 
Date registered: 2018/08/17 
Proponent: Tourbières L.M. Ltée 

Description: The proponent is proposing to harvest peat by developing Bog #564, near Saint-Léolin, which will include the construction of an access road, sedimentation ponds, and drainage channels. 
Location: Gloucester 
EIA specialist: Pierre Doucet 
Status: Certificate of Determination issued (PDF 131 KB)
Date of decision: 2019/12/02 Shape

Project number: 1501 
Date registered: 2018/09/13 
Proponent: The Village of Grand Manan 

Description: The Village is proposing to construct and operate an Aquatic Centre and Wellness Facility consisting of a 5-lane lap pool, a children’s pool with a slide, a spectator area, walking track, ancillary support area, and revenue spaces. 
Location: Charlotte 
EIA specialist: Sheila Goucher 
Status: Determination review in progress 

Project number: 1502 
Date registered: 2018/09/10 
Proponent: Fisheries and Oceans Canada – Small Craft Harbours (PDF 1.6 MB)
Description: The proponent is proposing to decommission three wharfs on Campobello Island and Deer Island in the locations of Curry Cove, Chocolate Cove, and Richardson Wharf. 
Location: Charlotte 
EIA specialist: Cassandra Colwell 
Status: Certificate of Determination issued (PDF 160 KB)
Date of decision: 2019/02/14 

Project number: 1503 
Date registered: 2018/09/12 
Proponent: Fisheries and Oceans – Small Craft Harbours (DFO-SCH) (PDF 977 KB)
Description: The proposed project consists of expanding the existing containment cell at the Pointe-Sapin Harbour and dredging the harbour basin. 
Location: Kent 
EIA specialist: Rachelle Voisine 
Status: Certificate of Determination issued (PDF 167 KB)
Date of decision: 2018/02/02 

Project number: 1504 
Date registered: 2018/09/17 
Proponent: The Department of Transportation and Infrastructure (PDF 5.8 MB)
Description: The proponent proposes to decommission the existing sewage treatment lagoon at Harvey High School. 
Location: York 
EIA specialist: Rachelle Voisine 
Status: Certificate of Determination issued (PDF 167 KB)
Date of decision: 2019/01/31 

Project number: 1505 
Date registered: 2018/09/13 
Proponent: Fisheries and Oceans Canada – Small Craft Harbours (DFO-SCH) 

Description: The project consists of decommissioning a derelict small craft harbour facility. The work will involve removal of the end of an existing wharf and covering the remainder with rock to stabilize it and create a breakwater. 
Location: Charlotte 
EIA specialist: Sheila Goucher 
Status: Certificate of Determination issued (PDF 167 KB)
Date of decision: 2018/12/07 Shape

Project number: 1506 
Date registered: 2018/09/20 
Proponent: Wocawson Energy Project 

Description: The proposed project involves the construction of 6 to 12 wind turbine generators with a capacity of 20 to 40 Mega Watts, a new substation and a new transmission line. The proposed project is located on crown land 20 km northeast of Sussex, New Brunswick. 
Location: Kings 
EIA specialist: Pierre Doucet 
Status: Certificate of Determination issued (PDF 182 KB)
Date of decision: 2019/03/12 

Project number: 1507 
Date registered: 2018/10/29 
Proponent: Repairs to Retaining Wall at 11 Southers Road (Bayswater) Adjacent to Wetland 

Description: The proposed project involves the construction of a new retaining wall within a regulated wetland to support an existing retaining wall which has become eroded. 
Location: Kings 
EIA specialist: Cassandra Colwell 
Status: Certificate of Determination issued (PDF 167 KB)
Date of decision: 2018/12/06

Project number: 1508 
Date registered: 2018/11/02 
Proponent: Hammond River Holdings Limited 

Description: The proposed project involves the development of an open pit quarry for the extraction of gypsum. 
Location: Kings 
EIA specialist: Patricia Holland 
Status: Certificate of Determination issued (PDF 148 KB)
Date of decision: 2019/10/15 

Project number: 1509 
Date registered: 2018/11/20 
Proponent: Fisheries and Oceans Canada – Small Craft Harbours (DFO-SCH) 

Description: The proponent proposes to construct a new containment cell, conduct other associated alterations, install a new floating wharf and dredge the harbour basin at the Anse-Bleue Harbour. 
Location: Gloucester 
EIA specialist: Rachelle Voisine 
Status: Certificate of Determination issued (PDF 166 KB)
Date of decision: 2019/06/12 

Project number: 1510 
Date registered: 2018/11/23 
Proponent: Berthe Comeau (PDF 4 MB)
Description: The proponent is proposing to expand their existing campground “Chalet & Camping de la Pointe” of 178 sites by adding eleven new sites with services, using an existing well and installing a sewage system. 
Location: Gloucester 
EIA specialist: Cassandra Colwell 
Status: Certificate of Determination issued (PDF 220 KB)
Date of decision: 2019/08/28 

Project number: 1511 
Date registered: 2018/12/03 
Proponent: Villa Sormany (PDF 11.9 MB)
Description: The proponent is proposing to develop a new potable water well for the Villa Sormany nursing home in Robertville. 
Location: Gloucester 
EIA specialist: Pierre Doucet 
Status: Certificate of Determination issued (PDF 167 KB)
Date of decision: 2019/05/30 

Project number: 1512 
Date registered: 2018/12/18 
Proponent: Domaine Nature Estates Subdivision (PDF 11.8 MB)
Description: The proponent is proposing to continue development of the existing subdivision, consisting of 88 lots. The proposed expansion will add an additional 80 lots and associated infrastructure. 
Location: Westmorland 
EIA specialist: Duane Mercer 
Status: Certificate of Determination issued (PDF 193 KB)
Date of decision: 2020/02/07 

Project number: 1513 
Date registered: 2018/12/19 
Proponent: At Landing (PDF 5.3 MB)
Description: The proponent proposes to expand their existing facility in Blacks Harbour by adding a sea cucumber cutting and blanching process. 
Location: Charlotte 
EIA specialist: Jillian Craig 
Status: Certificate of Determination issued (PDF 129 KB)
Date of decision: 2021/06/07 

Project number: 1514 
Date registered: 2018/12/21 
Proponent: Kelly Cove Salmon Ltd. (PDF 26.8 MB)
Description: The proponent proposes to expand the Johnson Lake Hatchery and upgrade the waste treatment system. 
Location: Charlotte 
EIA specialist: Rachelle Voisine 
Status: Certificate of Determination issued (PDF 143 KB)
Date of decision: 2019/07/05